Monday, June 13, 2011

Who needs a display home?

I've been playing with an iPhone app called Home Design 3D.

In the past I've found most programs for house deisgn to be very difficult to use, especially when you try to go beyond a 2D plan and try to draw something in 3D.

I've found this app very easy to use, it took me about 2 hours to put together our floorplan. It then has some templates for furniture, doors and windows you can add to generate something like this:



A recent update included some more furniture temapltes, but it would be great if there were more.

The best bit is yet to come. Press the 3D button and it renders your design:



and allows you to walk through the house. So here is what it might look like from the family room:



and looking back the other way from the kitchen:



Here is an aerial view of the back half ofthe house which shows what we changed with the kid's bathroom (adding another vanity) and the kids retreat:



I was amazed at how easy it was to put this together, so I thought LiveCad deserved a plug.

So who needs a display home anyway?

Work has started

Work has finally begun on our block, with the site scraped, pipes laid and the trenches dug in preparation for the slab. The weather for next week looks good so hopefully we will have a slab in the next few days.









I'm going to try to take a picture every few days from the same spot until lockup stage.

Saturday, May 28, 2011

So close

We have a sign on the block and a tap in the ground...



The final plans arrived yesterday and we received a call to say the site scrape should start Wednesday.

If you had told us it would take a year from when we sold our house for the build to start...we would not have believed you.

Sunday, April 24, 2011

Just discovered nearmap

We are still waiting for permits, loan approvals etc. In the meantime we came across nearmap.com.au which can give Google Map like satellite views at different dates.

Here are three images showing just prior to knock down, during the knock down and when the pool was being installed.





Amazing coincidence that the first picture they have for 2011 was on the day and time the pool was being delivered.

Saturday, April 16, 2011

We have a pool

Over the past two weeks the pool has been installed. Firstly they dug the hole and inserted the shell:



Trenches and pipes to were laid for the pump and filter, but they will not be installed until after the house.

They then put the water in the shell, concreted around the shell and boarded it up for the duration of the house build:



One of our new neighbours came over when the pool was coming in as they thought work had started on the house. They were pleased to hear that it was only the pool at this stage and that we are only planning a one-story home. I'm not surprised they were concerned given the number of homes in the area being replaced by either two-story town houses or two-story houses.

Monday, March 28, 2011

Signed our lives away, again

On Sunday we went back to our block and cut down the jungle that has grown with all the rain we had over summer. With at least 5 more weeks before Henley might start building we couldn't leave it any longer.

We signed our contract with Henley today, 9 weeks after putting the deposit down. Other than how much we are going to owe the bank after all this, we are very happy with the decision to switch to Henley and the Talise Q2.

We also told the pool company to get moving on installing the pool, we expect they will get that down before Easter and Henley would start not long after Easter.

Saturday, March 12, 2011

Moment of Truth

The tender meeting went extremely well.

The site costs were reasonable and no surprises. If anything they came in less than we expected.

The modifications to the plan were also less than we expected. We added a vanity outside the kid's bathroom, much like we had at our former house. We also added 1m across the middle, extending the dining room, laundry and bathroom. These changes were accepted by Henley with little fuss.

The electricals came to more than I had planned, but we included nearly all the fittings and in the end not having to worry about installing later seemed worth it.

We came to a reasonable arrangement with the pool in terms of OH&S. In addition to boarding it up after installation, we will pay for a temporary builders fence around it.

So the floor plan we have agreed to is



The site plan with the pool is



We came away feeling very relieved and believe we made better choices based on what we learnt from the previous builder.

Contract will be ready at the end of the month, hopefully they will start on the site in May and we will have moved in by Christmas.